WATER SUPPLY PROJECT FOR VUNG ANG ECONOMIC ZONE (2010)

  1. Investor: Vung Ang Investment and development JSC
  2. Total investment: 4.415 billion VND
  3. Scope of building: Include 04 main constructions
  • To build the Rao Tro reservoir with a capacity of 162.4 million m3;
  • To build the Lac Tien reservoir and the system of tunnels and downstream canals to transfer water from Rao Oo lake to Thuong Song Tri lake with the flow of 8.22 m3 / s, equivalent to 726,208 m3 / day;
  • Constructing new sluice gates to keep the freshwater, barrage of Ky Ha on the Quyen River; + To build a new water plant with a capacity of 140,000m3 / day; Water supply pipeline from the factory to the units that need water.